- Project Description:
The project focused on the structural calculation of a portal frame for a high-voltage electrical substation, intended to serve as an end-of-line portal frame. This structure was added after the construction of the substation, thereby extending its functionality.
- The main objective was to perform the structural calculation of a standard portal frame pre-designed by our client to verify that the portal frame met the construction and strength requirements as an end-of-line portal frame, all in accordance with the current technical specifications and regulations.
- We considered the regulatory actions of the Technical Building Code (CTE), as well as those established in the client’s technical guide.